August, 2023: The Buildup
Constructing Connection
Workers diligently constructed the structural steel for the pedestrian bridge between the tower and the Pavilion.
Building Bridges
The structure of the pedestrian bridge between the tower and the Pavilion was framed.
The Link
This bridge will serve as a connection point for employees and visitors of the new Global Headquarters facility.
On the Ground Floor
This raised floor, used in select areas of the Pavilion, will offer flexibility for future updates to the space.
The Sherwin-Williams Company (“Sherwin-Williams”) owns all right title and interest in and to the project progress videos and photos located on this page (the “Videos” and the “Photos”).
Permission to use Photos and/or Videos
Sherwin-Williams gives you permission to use the Photos and the Videos available for download, across all platforms (including TV, websites and social media) provided that (1) the visual content in any Photos and Videos is not altered (other than shortening Videos for timing purposes), (2) the Photos and Videos are used solely for the purpose of reporting on the progress of the Sherwin-Williams Building Our Future Project and (3) you acknowledge that Sherwin-Williams is the owner of all right, title and interest in and to the Photos and Videos.
Please attribute the photos and/or footage to The Sherwin-Williams Company.