May 2022: Building Anchors Installed
Preparing the Foundation
In May 2022, the Building Our Future project was moving at a quick pace. At the Global HQ construction site, the team prepared for the foundation of the 36-story tower.
Building a Structurally Sound Tower
After the holes were drilled, the team reinforced the structures with steel cages and filled them with concrete. This concrete anchors the foundation to bedrock, making the building safe and structurally sound.
Anchoring the Building
The highly skilled construction teams at the Global HQ site installed critical skyscraper foundation components. These building anchors, a total of 28, were drilled deep into the earth, some reaching 300 feet below ground level.
The Sherwin-Williams Company (“Sherwin-Williams”) owns all right title and interest in and to the project progress videos and photos located on this page (the “Videos” and the “Photos”).
Permission to use Photos and/or Videos
Sherwin-Williams gives you permission to use the Photos and the Videos available for download, across all platforms (including TV, websites and social media) provided that (1) the visual content in any Photos and Videos is not altered (other than shortening Videos for timing purposes), (2) the Photos and Videos are used solely for the purpose of reporting on the progress of the Sherwin-Williams Building Our Future Project and (3) you acknowledge that Sherwin-Williams is the owner of all right, title and interest in and to the Photos and Videos.
Please attribute the photos and/or footage to The Sherwin-Williams Company.