August, 2023: Full Steam Ahead

On the Case

 

Delivery of laboratory casework was a much anticipated event.

Carefully Curated

 

The casework was chosen for color harmony with the rest of the furniture.

The Picture Comes Together

 

Laboratory casework was stagged for future installation where Sherwin-Williams researchers will eventually work.

Exterior Work Continues

 

After the last beam of the structural steel was placed in July, the work on the exterior of the R&D building progressed.

Lab Casework Installation

 

Laboratory casework is being installed in some wings of the building – a significant milestone in the construction of our Global R&D facility.

Paving the Way

 

Preparation of the grounds continues on the R&D facility, including blacktop parking lot installation, seen in the background.



The Sherwin-Williams Company (“Sherwin-Williams”) owns all right title and interest in and to the project progress videos and photos located  on this page (the “Videos” and the “Photos”).

 

Permission to use Photos and/or Videos

Sherwin-Williams gives you permission to use the Photos and the Videos available for download, across all platforms (including TV, websites and social media) provided that (1) the visual content in any Photos and Videos is not altered (other than shortening Videos for timing purposes), (2) the Photos and Videos are used solely for the purpose of reporting on the progress of the Sherwin-Williams Building Our Future Project and (3) you acknowledge that Sherwin-Williams is the owner of all right, title and interest in and to the Photos and Videos.

 

Please attribute the photos and/or footage to The Sherwin-Williams Company.