July, 2023: The Heat Is On

Building Enclosure

 

The work crew set the prefabricated panels that make up part of the enclosure for the connecting corridor between lab wings.

Installing Building Systems

 

With the ceiling grid in place, installation of overhead mechanical, electrical and plumbing (MEP) finishes has begun.

Preparing for a Pour

 

The formwork for the next large slab-on-deck concrete pour is being placed for the pilot plant.

Entryway Foundation Preparation

 

Preparations began for the slab-on-grade foundation of the main entryway of the new R&D facility. The enclosure of additional building sections can be seen proceeding in the background.



The Sherwin-Williams Company (“Sherwin-Williams”) owns all right title and interest in and to the project progress videos and photos located  on this page (the “Videos” and the “Photos”).

 

Permission to use Photos and/or Videos

Sherwin-Williams gives you permission to use the Photos and the Videos available for download, across all platforms (including TV, websites and social media) provided that (1) the visual content in any Photos and Videos is not altered (other than shortening Videos for timing purposes), (2) the Photos and Videos are used solely for the purpose of reporting on the progress of the Sherwin-Williams Building Our Future Project and (3) you acknowledge that Sherwin-Williams is the owner of all right, title and interest in and to the Photos and Videos.

 

Please attribute the photos and/or footage to The Sherwin-Williams Company.