March, 2023: Bringing the Vision to Life
Preparing the Paint
This painter is preparing to use Sherwin-Williams ceiling paint within the Central Utilities Plant (CUP) building. After coating the ceiling, the painters proceeded to coat the exterior precast walls.
Painting Begins
The Central Utilities Plant (CUP) was the first of the R&D facility buildings where paint was applied. As interior work progresses elsewhere on the site, more colorful touches will be added.
Second-story Progress
With the first-floor structure in place, development on the second story continues on the R&D facility.
Inspecting the Work
Great care has been taken throughout the Building Our Future project to ensure the highest standards of construction.
The Sherwin-Williams Company (“Sherwin-Williams”) owns all right title and interest in and to the project progress videos and photos located on this page (the “Videos” and the “Photos”).
Permission to use Photos and/or Videos
Sherwin-Williams gives you permission to use the Photos and the Videos available for download, across all platforms (including TV, websites and social media) provided that (1) the visual content in any Photos and Videos is not altered (other than shortening Videos for timing purposes), (2) the Photos and Videos are used solely for the purpose of reporting on the progress of the Sherwin-Williams Building Our Future Project and (3) you acknowledge that Sherwin-Williams is the owner of all right, title and interest in and to the Photos and Videos.
Please attribute the photos and/or footage to The Sherwin-Williams Company.